PROJECT MINNESOTA UNITED ALLIANZ FIELD, ST. PAUL, MN
DESIGN POPULOUS
GENERAL CONTRACTOR MORTENSON
BUILT BY EVENTSCAPE, MARCH 2019
This new soccer stadium opened in 2019 after two years in the making. Eventscape was contracted to engineer, fabricate and install four custom framed fabric ribbons for the ceiling of the Field Club. These ribbons covered the total length of the ceiling, over 55 feet long and 12 feet wide at the widest point. Because of the size of the ribbons, each of the frames required internal “ladder” frame bracing to maintain its shape. Various lighting effects are used to create the appropriate mood for various events.